Attention Metrobus users: 45-day road work between 2 stops
The "White Road" project on the Metrobus line in Istanbul has resumed. The work will last 45 days and will reduce the D-100 highway in the Kadıköy direction to 2 lanes.
12punto
Due to work planned to last 45 days on the Metrobus road between the IMM Social Facilities and the Yenibosna stop, the D-100 highway in the Kadıköy direction will be reduced to 2 lanes.
The "White Road" project on the Metrobus line, which had been paused due to electrical infrastructure repairs on the Avcılar side road, has resumed.
According to the statement made by the Istanbul Metropolitan Municipality (IMM), the "White Road" work to be carried out on the Metrobus road between the IMM Social Facilities in Avcılar and the Yenibosna stop is planned to last 45 days.
Due to the work, the D-100 highway in the Kadıköy direction will be reduced to 2 lanes.
Information regarding the work will be reminded to passengers through announcements and notices on Metrobus vehicles and at stops.
It is expected that directional signs at the stops and communication teams will guide passengers.