The locker room and connected sections used by the Fenerbahçe Football A-Team at the Chobani Stadium Şükrü Saracoğlu Sports Complex have been renovated through a comprehensive project.

The existing infrastructure in the areas, which had been in use for over 20 years, was completely dismantled and renewed from top to bottom. As part of the work, the flooring and wall coverings, ventilation systems, mechanical and electrical installations, and lighting infrastructure were overhauled.

Taking into account the needs of the players and the technical staff, the main entrance, corridors, locker room, medical room, wet areas, plunge pool, fitness and warm-up sections, as well as massage and treatment areas were reorganized.

Improvements were also made to the visiting team's locker room. While wall designs and interior applications were prepared with a modern approach, digital LED screens were installed in the locker room and the lighting systems of all areas were renewed.

With the technical and architectural arrangements, a usage environment suitable for the needs of the football A-team during match and training processes was created. It was stated that the cost of the renovation work was covered by members of the board of directors and did not place an additional burden on the club's budget.
News Source: 12punto